top of page

Future Focus

3D SAMPLING

Through the use of a 3D simulation software, we enhance our clients' experience throughout the manufacturing cycle. Our goal is to reduce our workflow time by moving from 2D sketches to 3D design from design, development to production. Instant customization of the fabric, trims, stitching, and construction allows for a streamlined approach as opposed to traditional methods of tedious sampling.

 

By allowing for a larger range of possible designs to choose from, our clients can focus on what's important; creating a beautiful design. 

Push Model (OLD)

Pull Model (NEW)

customer is the key 7.20.jpg
  • Faster production (10-15 weeks)

  • Smaller or large batch

  • Less waste/ sustainable

  • Demand based production

​

​

  • Slower production (12-15 months)

  • Small batches are inefficient

  • Large Sample Waste

  • Supply based production

​

​

PULL MODEL TIMELINE

Our goal is to reduce traditional workflow cycle by adapting a digital and fast way to our operation. Our whole manufacturing lead time is highly shortened by the digital pull supply chain strategy, which is designed for replenishment within 4 months from design stage.

OLD PUSH MODEL

NEW PULL MODEL

DEsign

Sampling

SElling

PLACEMENT

pRODUCTION

ONLINE/OFFINE STORES

6TH MONTH
7-8TH MONTH
8-9TH MONTH
10TH MONTH

Big Data Analytic

3D DEsign

3D Sampling

Digital Selling

Digital Placement

production

Online/ offline stores

Replenish

aNALYzE SALE 

11-12TH MONTH

rEPLENISH

13TH MONTH
bottom of page