Future Focus
3D SAMPLING
Through the use of a 3D simulation software, we enhance our clients' experience throughout the manufacturing cycle. Our goal is to reduce our workflow time by moving from 2D sketches to 3D design from design, development to production. Instant customization of the fabric, trims, stitching, and construction allows for a streamlined approach as opposed to traditional methods of tedious sampling.
By allowing for a larger range of possible designs to choose from, our clients can focus on what's important; creating a beautiful design.
Push Model (OLD)
Pull Model (NEW)
-
Faster production (10-15 weeks)
-
Smaller or large batch
-
Less waste/ sustainable
-
Demand based production
​
​
-
Slower production (12-15 months)
-
Small batches are inefficient
-
Large Sample Waste
-
Supply based production
​
​
PULL MODEL TIMELINE
Our goal is to reduce traditional workflow cycle by adapting a digital and fast way to our operation. Our whole manufacturing lead time is highly shortened by the digital pull supply chain strategy, which is designed for replenishment within 4 months from design stage.